Friday, March 7th, 2014 absolute Engineering Surveying at a new Ocado Distribution Centre – September 2011

We were contacted by an international supplier / installer of automated logistic solutions who requested that we carry out an as-built survey within a new purpose built 400’000 sq ft distribution facility. The equipment has to be installed to very tight tolerances so a detailed survey of all of the steel columns, internal walls and lift pits was required.

Working alongside the building contractors we surveyed over 500 columns to record the as built position, orientation, alignment and verticality.